Fernando Drive subdivision.

9,000+ metres of post and rail across 22 sections. The largest staged delivery we have run.

Location
Fernando Drive, Waikato
Scope
9,000+ metres post and rail
Sections
22
Quoted by
Aaron Collins
Post and rail line at Fernando Drive subdivision, Waikato

Fernando Drive needed 9,000+ metres of post and rail across 22 sections. Our crew worked multiple sections in parallel over several weeks. Aaron Collins ran the programme on site, handling section-by-section logistics and execution without disruption to the developer's handover schedule.

Developers come to us for this for two reasons. First, scheduling reliability across staged section handovers, because sections release in waves and the fencing has to be in before the section is sold. Second, a consistent finish across the whole estate, so every boundary line down the drive matches.

No delays, no patchwork. The same crew, the same gear, the same rail height running the full length of the drive.

Subdivision developers

Got a staged subdivision to fence?

We have run the biggest staged P&R job in our portfolio. Section release dates, consistent finish from drive to drive. Ring Aaron, we will scope it.